Quotations are required for the maintenance work and rubber tiles mat PISQ for further detail click on this slide.

23 Jun

1- Quotation Required:
Quotations are invited for the supply and installation of Rubber tile Mat.
Kindly send your sealed Quotation latest by 08-12-2017 on the following address.
Principal Pakistan International School P.O.Box 1930 Doha Qatar.

Scope of supply and Technical specification :
Rubber Tile mat
1).Tile Size 500×500 MM
2).Thickness 24 MM
3).Colour Maroon
4). Area: 28x19M=532 SQ.M

Installation of Rubber Tile Flooring
Removing the old carpet and interlock and installing Rubber Tile Mat (Size 28×19=532 sq.m)
General Terms and Conditions
No manpower /Meterials, equipments or tools shall supplied by PISQ.
Terms of Payment- 25% confirmation of LPO and balance payment terms to be decided after final negotiation of the project.
Enclose the following Documents
1). Valid CR copy
2). COC Registration copy
3). Financial Audit Report

CONTRACTOR REQUIREMENTS
All contractors are to visit site to view the works outlined in the Scope of Works. If a contractor quotes without viewing the site, it will be at their own risk.

2- Quotation Required:
Quotations are invited for the Repair/maintenance work of 20 Flats at teacher’s Residential complex.(Family accommodation)
Kindly send your sealed Quotation latest by 08-12-2017 on the following address.
Principal Pakistan International School P.O.Box 1930 Doha Qatar.

Scope of work
Repairing of ceiling:- Cleaning and chipping of damage area of the ceiling, Plastering of ceiling damage area using by plaster chemical with white cement and painting anti corrosive for corroded iron rods.
Tile fixing and Cladding Work:- Fitting tiles on the floor using tile adhesive.
Walls painting Work:- Cleaning of inside wall with sanding paper, repair of damage area by special powder of crack filler, apply one coat of PVC primer, apply two coat fenomastic matt by jotun company
Waterproofing:- Remove all old tiles from 20 no’s of toilets & waterproofing in Ist floor and fixing tiles. Change of old interplast PPR pipe and replacing with new.Faxing water leakage of all kitchen premises and waterproofing.
Technical specification.(each flat)
03 bedrooms, living room, Bathrooms, store, kitchen and Corridor.
1).Room size: 4×5=20 sq.M (20×3= 60 sq.M)
2).living room size: 4×5= 20 sq.M
3).Bathrooms size : 5×2= 10 sq.M and 3×2=6 sq.M
4). Store size : 3×2 =6 sq.m
5). Kitchen size: 5×3.20 =16 sq.M
6). Corridor size: 4×2.20 = 8.80 sq.M

General Terms and Conditions
No manpower /Meterials, equipments or tools shall supplied by PISQ.
Terms of Payment- 25% confirmation of LPO and balance payment terms to be decided after final negotiation of the project.

Enclose the following Documents
1). Valid CR copy
2). COC Registration copy
3). Financial Audit Report

CONTRACTOR REQUIREMENTS
All contractors are to visit site to view the works outlined in the Scope of Works. If a contractor quotes without viewing the site, it will be at their own risk.